1.Granting of Building Permit

Section 301 of the National Building Code states that “No person, firm or corporation, including any agency or instrumentality of government, shall construct, alter, convert, use, occupy, move, demolish, and add a building/structure or any portion thereof or cause the same to be done, without first obtaining a Building Permit from the Building Official assigned in the place where the subject building/structure is located or planned to be located”.

Any person desiring to obtain a building permit and any ancillary/accessory permit/s together with said Building Permit shall file the application/s on the prescribed application forms as stated in the latest Implementing Rules and Regulation of the National Building Code of the Philippines (PD 1096).

       

Office or Division:

Office of the City Engineer/Building Official

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Any person, firm or corporation including any agency or instrumentality of government who intends to construct, alter, convert, move, use, occupy, demolish and add a building/structure or portion thereof

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

4 copies - (NBC Form No. B-01) Application for Building Permit Form duly signed and sealed and notarized

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

4 copies - duly accomplished Ancillary Permit Forms (duly signed and sealed by the designing professional) such as: Architectural (NBC Form No. A-01), Civil/Structural (NBC Form No. A-02), Electrical (NBC Form No. A-03), Mechanical Permit (NBC Form A-04), Sanitary (NBC Form No. A-05), Plumbing (NBC Form No. A-06), Electronics (NBC Form No. A-07)

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

2 copies - Certified True Copy of OCT/TCT, Tax Declaration and Current RPT OR if incase the applicant is a registered owner of lot; and 2 copies - notarized Deed of Absolute Sale, Contract of Sale or Contract of Lease if in case the applicant is not a registered owner of the Lot    

                                 

Responsibility of the client

4 copies each set of Building Plans and technical specifications documents signed and sealed by its respective registered/professional engineers such as: Architectural, Civil/Structural, Electrical, Sanitary/Plumbing, Mechanical and Electronic including FDAS and Fire Protection Safety plans

Responsibility of the client

3 copies - Survey Plan signed & sealed by Geodetic Engineer

Responsibility of the client

2 copies - Structural Design Computations with seismic analysis 2- storeys and above or 1-storey with  attic/ mezzanine/ roof deck/ penthouse – duly signed and sealed by Designing Professional

Responsibility of the client

2 copies - Photocopy of PRC ID license and PTR of engineers who signed the forms

Responsibility of the client

4 copies - duly notarized Bill of Materials/Cost Estimates

Responsibility of the client

2 copies - duly notarized application form for Locational Clearance with 1 copy of Vicinity/Location/Site development plan and bill of materials/cost estimates

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

1 copy – Photocopy of Barangay Clearance

Barangay Hall wherein the project is located

1 copy – Photocopy of necessary clearances from various national agencies exercising regulatory functions applicable to the proposed project. In lieu of the above clearance/s, an affidavit of undertaking securing the necessary clearances and submitting to Mun. Engineer Office within one (1) month period is accepted.

To be secured by the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.   Submit the duly accomplished application forms for permits and Locational Clearance, plans and the required documents at front desk for initial verification of the requirements.

1.1.   Receive after verification of completeness of requirements    

       

1.2.   Endorse 1 set of plans and specs to BFP Fire Marshall for FSEC issuance and application form for Locational Clearance to Zoning Admin. Office with attached documentary requirements thereof.

1.3.   Inform the applicant the date & time of inspection (if necessary) and his/her return to office

None

20 minutes

Engineering Staff at front desk

1.4.   Make evaluation of plans, specifications and other documents including assessment of fees

None

2 hours

Engineering Staff

Engineer II

City Engineer

2.   Inquire about the results of the evaluation and assessment 3 working days after submission:

a.   If there are no deficiencies, proceed to Step 4.

b.   If there are deficiencies, you will be informed of lacking documents that need correction.

2.   Informs the client whether the documents and requirements including locational clearance are complete, in order and inconformity with CLUP or whether plans and documents submitted require correction/s

None

10 Minutes

Engineering Staff

3.   Submit lacking documents/correc-ted plans for review.

3.   Receives and review submission.

None

20 Minutes

Engineering Staff

Engineer II/

City Engineer

4.   Secure an order of payment for Bldg. Permit & Locational Clearance after the application has been determined to be complete and in order and FSEC Order of Payment has been issued by Mun. Fire Marshall

4.   Issue order of payment for Building Permit and Locational Clearance

None

10 Minutes

Engineering Staff at front desk

5.   Proceed to the City Treasurer’s Office and present the order of payment. Pay the required fees and secure an official receipt.

5.   Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

Assessed fees based on schedule of fees under IRR of    PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

(For simple construction under JMC No. 2018-01 dated Jan 4, 2018, the building official shall issue building permit within a maximum period of five calendar days after the complete documentary requirements and application for building permit have been received and conforms to the requirements of the code)

The applicant shall be informed by the staff of Building Official thru text if permit has been approved and ready for pick up within two days after payment of fees

Engineering Staff

City Engineer

6.   On scheduled date, proceed to the City Engineer’s Office and claim the approved building permit.

6.   Releases the approved building permit.

None

10 Minutes

Engineering Staff at front desk

Office or Division:

Office of the City Engineer/Building Official

Classification:

Complex

Type of Transaction:

G2C

Who may avail:

Any person, firm or corporation including any agency or instrumentality of government who intends to construct, alter, convert, move, use, occupy, demolish and add a building/structure or portion thereof

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

4 copies - (NBC Form No. B-01) Application for Building Permit Form duly signed and sealed and notarized

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

4 copies - duly accomplished Ancillary Permit Forms (duly signed and sealed by the designing professional) such as: Architectural (NBC Form No. A-01), Civil/Structural (NBC Form No. A-02), Electrical (NBC Form No. A-03), Mechanical Permit (NBC Form A-04), Sanitary (NBC Form No. A-05), Plumbing (NBC Form No. A-06), Electronics (NBC Form No. A-07)

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

2 copies - Certified True Copy of OCT/TCT, Tax Declaration and Current RPT OR if incase the applicant is a registered owner of lot; and 2 copies - notarized Deed of Absolute Sale, Contract of Sale or Contract of Lease if in case the applicant is not a registered owner of the Lot    

                                 

Responsibility of the client

4 copies each set of Building Plans and technical

 specifications documents signed and sealed by its respective registered/professional engineers such as: Architectural, Civil/Structural, Electrical, Sanitary/Plumbing, Mechanical and Electronic including FDAS and Fire Protection Safety plans

Responsibility of the client

3 copies - Survey Plan signed & sealed by Geodetic Engineer

Responsibility of the client

2 copies - Structural Design Computations with seismic analysis 2- storeys and above or 1-storey with  attic/ mezzanine/ roof deck/ penthouse – duly signed and sealed by Designing Professional

Responsibility of the client

2 copies - Plate Load Test Analysis for (3) storeys or two storeys with attic/ mezzanine/ roof deck/ penthouse; or 2 Copies - Soil Boring Test Result for (4) storeys and above or 3 storeys with attic, mezzanine/ roof deck/ penthouse- 2 copies

2 copies - Photocopy of PRC ID license and PTR of engineers who signed the forms

Responsibility of the client

4 copies - duly notarized Bill of Materials/Cost Estimates

Responsibility of the client

2 copies – Photocopy of Locational Clearance

To be secured by client at the Office of Zoning Administrator

1 copy – Occupational Safety and Health Program approved by DOLE

Responsibility of the client

1 copy – Photocopy of Barangay Clearance

Barangay Hall wherein the project is located

1 copy – Photocopy of other necessary clearances from various agencies exercising regulatory functions applicable to the proposed project. In lieu of the above clearances, an affidavit of undertaking securing the necessary clearances and submitting the same to OBO within 1 month is accepted.

To be secured by client

 

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.   Submit the duly accomplished application forms for permits and Locational Clearance, plans and the required documents at front desk for initial verification of the requirements.

1.1.   Receive after verification of completeness of requirements    

       

1.2.   Endorse 1 set of plans and specs to BFP Fire Marshall for FSEC issuance

1.3.   Inform the applicant the date & time of inspection (if necessary) and his/her return to office

None

20 minutes

Engineering Staff at front desk

1.4.   Make evaluation of plans, specifications and other documents including assessment of fees

None

1 day & 4 hours

Engineering Staff

Engineer II

City Engineer

2.   Inquire about the results of the evaluation and assessment 5 working days after submission:

a.   If there are no deficiencies, proceed to Step 4.

b.   If there are deficiencies, you will be informed of lacking documents that need correction.

2.1.   Informs the client whether the documents and requirements are complete, in order or whether plans and documents submitted require correction/s

None

15 Minutes

Engineering Staff

3.   Submit lacking documents/correc-ted plans for review.

3.   Receives and review submission.

None

20 Minutes

Engineering Staff

Engineer II/

City Engineer

4.Secure an order of payment for Bldg. Permit after the application has been determined to be complete and in order and FSEC has been issued by Mun. Fire Marshall.

4.1 Issue order of payment for Building Permit

4.2 Advise the client to return to Office two working days after payment of fees to claim the permit

None

10 Minutes

Engineering Staff at front desk

5.Proceed to the City Treasurer’s Office and present the order of payment. Pay the required fees and secure an official receipt.

5.Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

Assessed fees based on schedule of fees under IRR of PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

6.On scheduled date, proceed to the City Engineer’s Office and claim the approved building permit.

6.Releases the approved building permit.

None

10 Minutes

Engineering Staff at front desk

Office or Division:

Office of the City Engineer/Building Official

Classification:

Highly technical

Type of Transaction:

G2C

Who may avail:

Any person, firm or corporation including any agency or instrumentality of government who intends to construct, alter, convert, move, use, occupy, demolish and add a building/structure or portion thereof

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

4 copies - (NBC Form No. B-01) Application for Building Permit Form duly signed and sealed and notarized

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

4 copies - duly accomplished Ancillary Permit Forms (duly signed and sealed by the designing professional) such as: Architectural (NBC Form No. A-01), Civil/Structural (NBC Form No. A-02), Electrical (NBC Form No. A-03), Mechanical Permit (NBC Form A-04), Sanitary (NBC Form No. A-05), Plumbing (NBC Form No. A-06), Electronics (NBC Form No. A-07)

Forms to be secured at front desk of Mun. Engineer’s Office and to be accomplished by client

2 copies - Certified True Copy of OCT/TCT, Tax Declaration and Current RPT OR if incase the applicant is a registered owner of lot; and 2 copies - notarized Deed of Absolute Sale, Contract of Sale or Contract of Lease if in case the applicant is not a registered owner of the Lot    

                                 

Responsibility of the client

4 copies each set of Building Plans and technical specifications documents signed and sealed by its respective registered/professional engineers such as: Architectural, Civil/Structural, Electrical, Sanitary/Plumbing, Mechanical and Electronic including FDAS and Fire Protection Safety plans

Responsibility of the client

3 copies - Survey Plan signed & sealed by Geodetic Engineer

Responsibility of the client

2 copies - Structural Design Computations with seismic analysis 2- storeys and above or 1-storey with  attic/ mezzanine/ roof deck/ penthouse – duly signed and sealed by Designing Professional

Responsibility of the client

2 copies - Plate Load Test Analysis for (3) storeys or two storeys with attic/ mezzanine/ roof deck/ penthouse; or 2 Copies - Soil Boring Test Result for (4) storeys and above or 3 storeys with attic, mezzanine/ roof deck/ penthouse- 2 copies

2 copies - Photocopy of PRC ID license and PTR of engineers who signed the forms

Responsibility of the client

4 copies - duly notarized Bill of Materials/Cost Estimates

Responsibility of the client

2 copies – Photocopy of Locational Clearance

To be secured by client at the Office of Zoning Administrator

1 copy – Photocopy of Barangay Clearance

Barangay Hall wherein the project is located

1 copy – Occupational Safety and Health Program approved by DOLE

Responsibility of the Client

1 copy – Photocopy of other necessary clearances from various agencies exercising regulatory functions applicable to the proposed project. In lieu of the above clearances, an affidavit of undertaking securing the necessary clearances and submitting the same to OBO within 1 month period is accepted.

To be secured by client

 

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Submit the duly accomplished application forms for permits and Locational Clearance, plans and the required documents at front desk for initial verification of the requirements.

1.1 Receive after verification of completeness of requirements      

     

1.2 Endorse 1 set of plans and specs to BFP Fire Marshall for FSEC issuance

1.3 Inform the applicant the date & time of inspection (if necessary) and his/her return to office

None

25 minutes

Engineering Staff at front desk

1.4 Make evaluation of plans, specifications and other documents including assessment of fees

None

10 days

Engineering Staff

Engineer II

City Engineer

2.Inquire about the results of the evaluation and assessment 12 working days after submission:

  1.  If there are no deficiencies, proceed to Step 4.
  2. If there are deficiencies, you will be informed of lacking documents that need correction.

2.Informs the client whether the documents and requirements are complete and in order or whether plans and documents submitted require correction/s

None

15 Minutes

Engineering Staff

3.Submit lacking documents/correc-ted plans for review.

3.1 Receives and review submission.

3.2 Re-evaluate and re-assess fees

None

1 hour

Engineering Staff

Engineer II/

City Engineer

4.Secure an order of payment for Bldg. Permit after the application has been determined to be complete and in order and FSEC has been issued by Mun. Fire Marshall.

4.1 Issue order of payment for Building Permit

4.2 Advise the client to return to Office three working days after payment of fees to claim the permit

None

10 Minutes

Engineering Staff at front desk

5.Proceed to the City Treasurer’s Office and present the order of payment. Pay the required fees and secure an official receipt.

5.Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

Assessed fees based on schedule of fees under IRR of PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

6.On scheduled date, proceed to the City Engineer’s Office and claim the approved building permit.

6.Releases the approved building permit.

None

10 Minutes

Engineering Staff at front desk

2.Granting Permits Supplementary to Building Permit

The following permits are required to secure a building Permit:

                Ancillary Permits

The Ancillary Permits duly signed and sealed by the corresponding professionals and the plans and specifications shall be submitted together with duly notarized application for Building Permit. The Building Permit is null and void if not   accompanied by the Ancillary Permits. The prescribed Ancillary and other Accessory Permits/forms shall likewise be used whenever applicable. The Ancillary Permits are the following:

Accessory Permits

Accessory Permits are issued by the Building Official for accessory parts of project with very special functions or use which are indicated in the plans and specifications that the building permit application. These may include, among others: bank and record vaults; swimming pool; firewalls separate from the building/ structure; towers; silos, smokestacks; chimneys; commercial/ industrial fixed ovens; industrial kilns/ furnaces; water/ waste treatment tanks, septic vaults; concrete and steel tanks; booths, kiosks and stages; and tombs, mausoleums and niches.

Accessory Permits are issued by the Building Officials for activities being undertaken prior to or during the processing of the building permit. The coverage is spelled out in the accessory permit form including the expiry period. This shall be signed by the owner/applicant and by the concerned professionals. These permits include, among others, ground preparation and excavation, encroachment of foundation to public area, fencing, for fence not exceeding 1.80 meters high, sidewalk construction, temporary sidewalk enclosure and occupancy, erection of scaffolding, erecting, repair, removal of sign; and demolition.

       

Office or Division:

Office of the City Engineer/Building Official

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations seeking a building permit

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Fencing Permit

  1. 4 copies - Fencing Permit Form (NBC Form No. B-03) duly signed and sealed and notarized
  2. 4 copies - Fencing Plan & specifications signed & sealed
  3. 4 copies - Bill of Materials and Cost Estimates, duly notarized
  4. 2 copies – Certified true copy of TCT/OCT
  5. 2 copies - Deed of Sale/Lease Contract/Contract Sell, if the OCT/TCT is not in the name of the owner/applicant

Forms to be secured at front desk of Engineering Office and to be accomplished by the client

Demolition Permit

  1. 4 copies - Demolition Permit Form (NBC Form No. B-08) duly signed and sealed and notarized
  2. 4 copies - Sketch Plan/ Vicinity
  3. 2 copies - Certified True Copy of OCT/TCT

Forms to be secured at front desk of Engineering Office and to be accomplished by the client

Permit for Temporary Service Connection

  1. 3 copies - Permit for Temporary Service Connection Form (NBC Form No. E-03)
  2. 3 copies - Building Permit (for new construction)
  3. 3 copies - Electrical Plan/ Layout
  4. 1 copy – Fire Safety Evaluation Clearance from BFP

Forms to be secured at front desk of Engineering Office and to be accomplished by the client

Temporary Sidewalk Enclosure and Occupancy Permit

  1. 4 copies - Temporary Sidewalk Enclosure and Occupancy Permit Form (NBC Form No. B - 05)
  2. 4 copies - Sketch Plan of sidewalk to be constructed/ repaired.

Forms to be secured at the front desk of Engineering Office and to be accomplished by the client

Sign Permit

  1. 4 copies - Sign Permit Form (NBC Form No. B-07) duly signed and sealed and notarized
  2. 4 copies - Building Permit Form whenever there is a concrete /steel structure, duly signed and sealed and notarized
  3. 2 copies - Structural Analysis duly signed and sealed
  4. Zoning Clearance
  5. 4 copies - Electrical Permit (NBC Form No. A-03) whenever there is an electrical connection
  6. 1 copy - Fire Clearance whenever there is an electrical connection
  7. 4 copies - Sketch Plan of signage/s to be installed/ erected.
  8. 4 copies - Location/ Vicinity Plan/ Site Development Plan
  9. 2 copies - Lot documents whenever it occupies a private lot
  10. 1 copy - DPWH clearance (for national road s/highways)
  11. 4 copies - Specifications and Cost Estimates duly notarized
  12. Contract of Lease, if not owned

Forms to be secured at the front desk of Engineering Office and to be accomplished by the client

Excavation and Ground Preparation Permit

         

  1. 3 copies - Accomplished Permit Form
  2. 3 copies Sketch Plan

Forms to be secured at the front desk of Engineering Office and to be accomplished by the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Accomplish the    forms and submit the same along with other requirements.

1.1 Verifies the completeness of plans and received

None

10 minutes

Engineering Staff at front desk

1.2 Make evaluation of plans, specifications and other documents including assessment of fees

None

30 Minutes

Engineering Staff

Engineer II

City Engineer

2.Inquire about the results of the evaluation and assessment one working day after submission of documents

  1. If there are no deficiencies, proceed to Step 4.
  2. If there are deficiencies, you will be informed of lacking documents that need correction.

2.Informs the client whether the documents and requirements are complete and in order or whether plans and documents submitted require correction/s

None

10 Minutes

Engineering Staff

3.Submit lacking documents/correc-ted plans for review.

3.Receives and review submission.

None

20 Minutes

Engineering Staff

Engineer II/

City Engineer

4.Secure an order of payment for Permit after the application has been determined to be complete and in order

4.1 Issues order of payment for Permit

4.2 The client shall be informed by the staff of OBO that the approved permit is ready for release one working day after payment of fees

None

10 Minutes

Engineering Staff at front desk

5.Proceed to the City Treasurer’s Office and present the order of payment. Pay the required fees and secure an official receipt.

5.1 Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

 

Assessed Fess

10 minutes

Treasurer’s Revenue Collection Clerk

On scheduled date, proceed to the City Engineer’s Office and claim the approved building permit.

5.2 Releases the approved permit.

None

10 Minutes

Engineering Staff at front desk

3.Issuance of Certificate of Occupancy

An occupancy permit is required before any building/ structure is used or occupied. It is usually secured after the completion of a structure.

It is also required if there is any change in the existing use or occupancy classification of a building, structure or any portion thereof.

Office or Division:

Office of the City Engineer/Building Official

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations who wish to occupy a newly completed structure or one that has changed existing use or occupancy classification

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

3 copies - As Built Plans, in cases where there are changes in the approved building plans, reflecting all the changes/modifications/alterations/amendments

 Responsibility of the client

Three (3) copies of duly notarized Certificate of Completion Form (NBC Form No. B-10), duly signed and sealed with all involved professionals

Form to be secured at the front desk of Engineering Office and to be accomplished by the client

One (1) copy of Logbook of Building Construction duly accomplished by the contractor (if undertaken by contract) and signed and sealed by Architect or Civil Engineer

Responsibility of the client

One (1) copy of the valid licenses of all involved professionals (e.g. PTR and PRC Card)

Responsibility of the client

One (1) copy of Photograph of completed structure showing front, sides and rear areas

Responsibility of the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Submit the duly accomplished forms and documentary requirements to assigned Engineering staff. Take note of the inspection schedule.

1.Reviews the completeness of required documents. Inform the client of schedule date of inspection. Endorses 1 set of asbuilt plans and specifications to BFP Calaca for inspection and issuance of Certificate of Fire Safety Inspection

None

15 Minutes

Engineering Staff at front desk

2.Be available at project site with building inspectors/technical staff during the inspection of the completed structure

2.1 Conducts inspection and check if the structure is built in accordance with the approved plans and specifications.

2.2 Make assessment of corresponding fees

None

2.5 hours

Engineer II

City Engineer

3.Inquire about the results of inspection one day after conduct of inspection.

  1. If there are no deficiencies, proceed to Step 6.

If there are deficiencies, you will be informed said deficiencies.

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction.

None

15 minutes

Engineering Staff at front desk

4.Undertake corrections and/ or additional requirements for review. Inquire for schedule of re-inspection

4.Receives and reviews submission if any. Inform the date of re-inspection.

15 minutes

Engineering Staff at front desk

5.Be available at project site with engineering team during the re- inspection.

5.Conducts re-inspection.

None

1.5 hours

Engineer II

City Engineer

6.Secure an Order of Payment after the documents/ requirements and/or corrections have been found to be complete and/ or in order and FSIC  Order of Payment has been issued by Mun. Fire Marshall.

6.Issue an order of payment.

None

10 minutes

Engineering Staff at front desk

7.Present the order of payment, pay and secure official receipt to the City Treasurer’s Office.

7.Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

Assessed fees based on schedule of fees under IRR of PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

(For simple construction under JMC No. 2018-01 dated Jan 4, 2018, the building official shall issue certificate of occupancy within a maximum period of five calendar days after the complete documentary requirements and application for occupancy have been received and conforms to the requirements of the code)

The applicant shall be informed by the staff of Building Official thru text if occupancy permit has been approved and shall be ready for pick up within two (2) day after payment of fees

Engineering Staff

City Engineer

8.On schedule date Secure approved Occupancy Permit.

8.Releases approved occupancy permit.

None

10 minutes

Engineering Staff at front desk

Office or Division:

Office of the City Engineer/Building Official

Classification:

Complex

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations who wish to occupy a newly completed structure or one that has changed existing use or occupancy classification

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

3 copies - As Built Plans, in cases where there are changes in the approved building plans, reflecting all the changes/modifications/alterations/amendments

 Responsibility of the client

Three (3) copies of duly notarized Certificate of Completion Form (NBC Form No. B-10), duly signed and sealed with all involved professionals

Form to be secured at the front desk of Engineering Office and to be accomplished by the client

One (1) copy of Logbook of Building Construction duly accomplished by the contractor (if undertaken by contract) and signed and sealed by Architect or Civil Engineer

Responsibility of the client

One (1) copy of the valid licenses of all involved professionals (e.g. PTR and PRC Card)

Responsibility of the client

One (1) copy of Photograph of completed structure showing front, sides and rear areas

Responsibility of the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Submit the duly accomplished forms and documentary requirements to assigned Engineering staff. Take note of the inspection schedule.

1.Reviews the completeness of required documents. Inform the client of schedule date of inspection. Endorses 1 set of as-built plans and specifications to BFP Calaca for inspection and issuance of Certificate of Fire Safety Inspection

None

15 Minutes

Engineering Staff at front desk

2.Be available at project site with building inspectors/technical staff during the inspection of the completed structure

2.1 Conducts inspection and check if the structure is built in accordance with the approved plans and specifications.

2.2 Make assessment of corresponding fees

None

4 hours

Engineer II

City Engineer

3.Inquire about the results of inspection one day after conduct of inspection.

  1. If there are no deficiencies, proceed to Step 6.
  2. If there are deficiencies, you will be informed said deficiencies.

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction.

None

15 minutes

Engineering Staff at front desk

4.Undertake corrections and/ or additional requirements for review. Inquire for schedule of re-inspection

4.Receives and reviews submission if any. Inform the date of re-inspection.

15 minutes

Engineering Staff at front desk

5.Be available at project site with engineering team during the re- inspection.

5.Conducts re-inspection.

None

2 hours

Engineer II

City Engineer

6.Secure an Order of Payment after the documents/ requirements and/or corrections have been found to be complete and/ or in order and FSIC Order of Payment has been issued by Mun. Fire Marshall.

6.1 Issue an order of payment.

6.2 Advise the client to return to office two working days after payment of fees to claim the permit

None

10 minutes

Engineering Staff at front desk

7.Present the order of payment, pay and secure official receipt to the City Treasurer’s Office.

7.Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

Assesses fees

10 minutes

Treasurer’s Revenue Collection Clerk

8.On schedule date Secure approved Occupancy Permit.

8.Releases approved occupancy permit.

None

10 minutes

Engineering Staff at front desk

Office or Division:

Office of the City Engineer/Building Official

Classification:

Highly technical

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations who wish to occupy a newly completed structure or one that has changed existing use or occupancy classification

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

3 copies - As Built Plans, in cases where there are changes in the approved building plans, reflecting all the changes/modifications/alterations/amendments

 Responsibility of the client

Three (3) copies of duly notarized Certificate of Completion Form (NBC Form No. B-10), duly signed and sealed with all involved professionals

Form to be secured at the front desk of Engineering Office and to be accomplished by the client

One (1) copy of Logbook of Building Construction duly accomplished by the contractor (if undertaken by contract) and signed and sealed by Architect or Civil Engineer

Responsibility of the client

One (1) copy of the valid licenses of all involved professionals (e.g. PTR and PRC Card)

Responsibility of the client

One (1) copy of Photograph of completed structure showing front, sides and rear areas

Responsibility of the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Submit the duly accomplished forms and documentary requirements to assigned Engineering staff. Take note of the inspection schedule.

1.Reviews the completeness of required documents. Inform the client of schedule date of inspection. Endorses 1 set of as-built plans and specifications to BFP Calaca for inspection and issuance of Certificate of Fire Safety Inspection

None

15 Minutes

Engineering Staff at front desk

2.Be available at project site with building inspectors/technical staff during the inspection of the completed structure

2.1 Conducts inspection and check if the structure is built in accordance with the approved plans and specifications.

2.2 Make assessment of corresponding fees

None

5 days

Engineer II

City Engineer

3.Inquire about the results of inspection  day five working days after conduct of inspection.

  1. If there are no deficiencies, proceed to Step 6.
  2. If there are deficiencies, you will be informed said deficiencies.

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction.

None

25 minutes

Engineering Staff at front desk

4.Undertake corrections and/ or additional requirements for review. Inquire for schedule of re-inspection

4.Receives and reviews submission if any. Inform the date of re-inspection.

20 minutes

Engineering Staff at front desk

5.Be available at project site with engineering team during the re- inspection.

5.Conducts re-inspection, final evaluation and assessment

None

1 day

Engineer II

City Engineer

6.Secure an Order of Payment after the documents/ requirements and/or corrections have been found to be complete and/ or in order and FSIC Order of Payment has been issued by Mun. Fire Marshall.

6.1 Issue an order of payment.

6.2 Advise the client to return to office two working days after payment of fees to claim the permit

None

10 minutes

Engineering Staff at front desk

7.Present the order of payment, pay and secure official receipt to the City Treasurer’s Office.

7.Receives payment and issues an official receipt.  Provide the Office of the Building Official a photocopy of OR

Assesses fees based on schedule of fees under IRR of PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

8.On schedule date Secure approved Occupancy Permit.

8.Releases approved occupancy permit.

None

10 minutes

Engineering Staff at front desk

4.Issuance of Certificate of Final Electrical Inspection

A Certificate of Final Electrical Inspection (CFEI) is required before any building / structure is used or occupied. It is usually secured after the completion of electrical installation and is a requirement in securing power service connection from the Batangas Electric Cooperative I.

It is also required if there is any change in the existing use or occupancy classification of a building/ structure or any portion thereof.

Office or Division:

Office of the City Engineer/Building Official

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations securing Power Service Connection from Batangas Electric Cooperative I

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Location/ Sketch Plan of Electrical Layout for 1-9 outlets only of not more than 1620 VA for indigenous dwellings

Responsibility of client

3 copies - Electrical Permit (NBC Form No. A-03)

Forms available at Engineering Office front desk and to be accomplished by client

3 copies - Electrical Plans and Electrical Specifications

Responsibility of client

Certificate of Completion for Electrical Installation

Responsibility of client

1 copy – BFP Fire Safety Inspection Certificate (for Electrical Service Connection)

To be secured from BFP Mun. Fire Marshall by client

3 copies - Bill of Materials and Cost Estimates

Responsibility of client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present the required supporting documents to any member of the building staff for initial verification of the requirements.

1.Verifies all necessary plans/ documents appropriate to the project and advises the client of the schedule date of inspection.

None

10 minutes

Engineering Staff at front desk

2.Be available at site with engineering team during inspection to answer whatever questions it may have.

2.Conducts site inspection, plan evaluation and assessment of fees

None

45 minutes

Engineering Staff/

Engineer II

3.Inquire about the results of evaluation and assessment one day after inspection of site.

  1. If there are no deficiencies, proceed to Step 6.
  2. If there are deficiencies you will be informed of said deficiencies.

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction/s.

None

10 minutes

Engineering Staff

4.Submit corrected documents, proof of corrections and/ or additional requirements for review. Inquire for schedule of re-inspection.

4.Receives and reviews submission. Inform schedule date of re- inspection

None

10 minutes

6.Be available at site with engineering team during the re-inspection of the site.

6.Conducts re-inspection

None

15 minutes

Engineering Staff/

Engineer II

7.After the documents/ requirements and/ or corrections have been found to be complete and/ or in order, secure an order of payment.

7.1 Issues an order of payment.

7.2 Advise the client to comeback 1 working day after payment of fees to claim the CFEI

Assessed fees

10 minutes

Engineering Staff at front desk

8.Present the order of payment to the City 8.Treasurer’s Office and pay the require fees. Secure an official receipt.

8.1 Receives payment and issues official receipt.

8.2 Provide OBO a photocopy of OR

Assessed fees based on schedule of fees under IRR of PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

9.Secure approved Certificate of Final Electrical Inspection

9. Releases approved certificate of final electrical inspection

None

10 minutes

Engineering Staff at front desk

Office or Division:

Office of the City Engineer/Building Official

Classification:

Complex

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations securing Power Service Connection from Batangas Electric Cooperative I

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Location/ Sketch Plan of Electrical Layout for 1-9 outlets only of not more than 1620 VA for indigenous dwellings

Responsibility of client

3 copies - Electrical Permit (NBC Form No. A-03)

Forms available at Engineering Office front desk and to be accomplished by client

3 copies - Electrical Plans and Electrical Specifications

Responsibility of client

Certificate of Completion for Electrical Installation

Responsibility of client

1 copy – BFP Fire Safety Inspection Certificate (for Electrical Service Connection)

To be secured from BFP Mun. Fire Marshall by client

3 copies - Bill of Materials and Cost Estimates

Responsibility of client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present the required supporting documents to any member of the building staff for initial verification of the requirements.

1.Verifies all necessary plans/ documents appropriate to the project and advises the client of the schedule date of inspection.

None

10 minutes

Engineering Staff at front desk

2.Be available at site with engineering team during inspection to answer whatever questions it may have.

2.Conducts site inspection, plan evaluation and assessment of fees

None

3 hours

Engineering Staff/

Engineer II

3.Inquire about the results of evaluation and assessment one day after inspection of site.

  1. If there are no deficiencies, proceed to Step 6.
  2. If there are deficiencies you will be informed of said deficiencies.

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction/s.

None

10 minutes

Engineering Staff

4.Submit corrected documents, proof of corrections and/ or additional requirements for review. Inquire for schedule of re-inspection.

4.Receives and reviews submission. Inform schedule date of re- inspection

None

10 minutes

5.Be available at site with engineering team during the re-inspection of the site.

5.Conducts re-inspection

None

30 minutes

Engineering Staff/

Engineer II

6.After the documents/ requirements and/ or corrections have been found to be complete and/ or in order, secure an order of payment.

6.1 Issues an order of payment.

6.2 Advise the client to comeback within a day or 1 working day after payment of fees to claim the CFEI

Assessed fees

10 minutes

Engineering Staff at front desk

7.Present the order of payment to the City Treasurer’s Office and pay the require fees. Secure an official receipt.

7.1 Receives payment and issues official receipt.

7.2 Provide OBO a photocopy of OR

None

10 minutes

Treasurer’s Revenue Collection Clerk

8.Secure approved Certificate of Final Electrical Inspection

8.Releases approved certificate of final electrical inspection

None

10 minutes

Engineering Staff at front desk

Office or Division:

Office of the City Engineer/Building Official

Classification:

Highly technical

Type of Transaction:

G2C

Who may avail:

Individuals, firms or corporations securing Power Service Connection from Batangas Electric Cooperative I

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Location/ Sketch Plan of Electrical Layout for 1-9 outlets only of not more than 1620 VA for indigenous dwellings

Responsibility of client

3 copies - Electrical Permit (NBC Form No. A-03)

Forms available at Engineering Office front desk and to be accomplished by client

3 copies - Electrical Plans and Electrical Specifications

Responsibility of client

Certificate of Completion for Electrical Installation

Responsibility of client

1 copy – BFP Fire Safety Inspection Certificate (for Electrical Service Connection)

To be secured from BFP Mun. Fire Marshall by client

3 copies - Bill of Materials and Cost Estimates

Responsibility of client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present the required supporting documents to any member of the building staff for initial verification of the requirements.

1.Verifies all necessary plans/ documents appropriate to the project and advises the client of the schedule date of inspection.

None

10 minutes

Engineering Staff at front desk

2.Be available at site with engineering team during inspection to answer whatever questions it may have.

2.Conducts site inspection, plan evaluation and assessment of fees

None

3 hours

Engineering Staff/

Engineer II

3.Inquire about the results of evaluation and assessment one day after inspection of site.

  1. If there are no deficiencies, proceed to Step 6.
  2. If there are deficiencies you will be informed of said deficiencies.

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction/s.

None

10 minutes

Engineering Staff

4.Submit corrected documents, proof of corrections and/ or additional requirements for review. Inquire for schedule of re-inspection.

4.Receives and reviews submission. Inform schedule date of re- inspection

None

10 minutes

5.Be available at site with engineering team during the re-inspection of the site.

5.Conducts re-inspection

None

30 minutes

Engineering Staff/

Engineer II

6.After the documents/ requirements and/ or corrections have been found to be complete and/ or in order, secure an order of payment.

6.Issues an order of payment.

Advise the client to comeback within a day or 1 working day after payment of fees to claim the CFEI

Assessed fees

10 minutes

Engineering Staff at front desk

7.Present the order of payment to the City Treasurer’s Office and pay the require fees. Secure an official receipt.

7.1 Receives payment and issues official receipt.

7.2 Provide OBO a photocopy of OR

None

10 minutes

Treasurer’s Revenue Collection Clerk

8.Secure approved Certificate of Final Electrical Inspection

8.Releases approved certificate of final electrical inspection

None

10 minutes

Engineering Staff at front desk

5.ISSUANCE OF CERTIFICATE OF ANNUAL ELECTRICAL INSPECTION AND CERTIFICATE OF ANNUAL INSPECTION

Business enterprises are required to secure a Building Inspection Approval from the City Engineer’s Office before the start of commercial operations and during the annual renewal of business permits. This service is among the process involved in securing Mayor’s Permit/ Business License.

Office or Division:

Office of the City Engineer/Building Official

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Business enterprises intending to start commercial operations or Intending to renew their business permits.

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

New Business License/ Mayor’s Permit:  

Location/ Sketch Plan with detailed information about business

Responsibility of the client

Photocopy of Certificate of Occupancy with attached copy of Certificate of Final Electrical Inspection

Responsibility of the client

Renewal of Business License/ Mayor’s Permit:

Photocopy of Certificate of Occupancy/Certificate of Annual Inspection

Responsibility of the client

Certification duly signed and sealed of a license Professional (Architect, CE, PEE, PME, RMP, SE)

Responsibility of the client

Certificate of Final Electrical Inspection, if any

To be secure from BFP Mun. Fire Marshall by the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present the required supporting documents for initial verification.

1.Verifies and reviews supporting documents. After verification of all necessary plans/ documents and clearances, you will be advised of the schedule date of inspection.

None

10 minutes

Engineering Staff

2.Be available at site with the inspection team during conduct of the inspection.

2.Conducts inspection, evaluation and assessment of fees

None

60 minutes

Engineer II

City Engineer

3.Inquire about the results one day after the inspection.

  1. if there are no deficiencies, proceed to Step 6.
  2. if there are deficiencies you will be instructed to make the necessary corrections

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction/s.

None

15 minutes

Engineering Staff

4.After complying with the corrections, inform the City Engineer’s Office and inquire schedule of re-inspection

4.Schedules re-inspection

None

10 minutes

Engineering Staff

5.Be available at site with the inspection team during conduct of the re-inspection.

5.Conducts re-inspection

None

45 minutes

Engineering Staff

Engineer II

City Engineer

6.Secure an order of payment from the City Engineer’s Office

6.1 Issues an order of payment

6.2 Advises the client to return one working day after payment of fees to claim the Certificate of Annual Inspection and Cert of Electrical Inspection

None

10 minutes

Engineering Staff

7.Present an order of payment, pay the required fees and secure an official receipt to the City Treasurer’s Office

7.1 Receives payment and issues official receipt.

7.2 Provide OBO of photocopy of OR

Assessed fees based on schedule of fees under IRR of PD 1096

10 minutes

Treasurer’s Revenue Collection Clerk

8.Secure approved Certificate of Annual Inspection and Certificate of Electrical Inspection.

8.Releases approved Certificate of Annual Inspection and Certificate of Electrical Inspection

None

5 minutes

Engineering Staff

Office or Division:

Office of the City Engineer/Building Official

Classification:

Complex

Type of Transaction:

G2C

Who may avail:

Business enterprises intending to start commercial operations or Intending to renew their business permits.

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

New Business License/ Mayor’s Permit:  

Location/ Sketch Plan with detailed information about business

Responsibility of the client

Photocopy of Certificate of Occupancy with attached copy of Certificate of Final Electrical Inspection

Responsibility of the client

Renewal of Business License/ Mayor’s Permit:

Photocopy of Certificate of Occupancy/Certificate of Annual Inspection

Responsibility of the client

Certification duly signed and sealed of a license Professional (Architect, CE, PEE, PME, RMP, SE)

Responsibility of the client

Certificate of Final Electrical Inspection, if any

 To be secure from BFP Mun. Fire Marshall by the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present the required supporting documents for initial verification.

1.1 Verifies and reviews supporting documents.

1.2 After verification of all necessary plans/ documents and clearances, you will be advised of the schedule date of inspection

None

10 minutes

Engineering Staff at front desk

2.Be available at site with the inspection team during conduct of the inspection.

2.Conducts inspection, evaluation and assessment of fees

None

2.5 hours

Engineer II

City Engineer

3.Inquire about the results one day after the inspection.

  1. if there are no deficiencies, proceed to Step 6.
  2. if there are deficiencies you will be instructed to make the necessary corrections

3.Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction/s.

None

15 minutes

Engineering Staff

4.After complying with the corrections, inform the City Engineer’s Office and inquire schedule of re-inspection

4.Schedules re-inspection

None

10 minutes

Engineering Staff

5.Be available at site with the inspection team during conduct of the re-inspection.

5.Conducts re-inspection

None

1 hour

Engineering Staff

Engineer II

City Engineer

6.Secure an order of payment from the City Engineer’s Office

6.1Issues an order of payment

6.2 Advises the client to return one working day after payment of fees to claim the Certificate of Annual Inspection and Cert of Electrical Inspection

None

10 minutes

Engineering Staff

7.Present an order of payment, pay the required fees and secure an official receipt to the City Treasurer’s Office

7.1 Receives payment and issues official receipt.

7.2 Provide OBO of photocopy of OR

None

10 minutes

Treasurer’s Revenue Collection Clerk

8.Secure approved Certificate of Annual Inspection and Certificate of Electrical Inspection.

7.3 Releases approved Certificate of Annual Inspection and Certificate of Electrical Inspection

None

5 minutes

Engineering Staff

Office or Division:

Office of the City Engineer/Building Official

Classification:

Highly Technical

Type of Transaction:

G2C

Who may avail:

Business enterprises intending to start commercial operations or Intending to renew their business permits.

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

New Business License/ Mayor’s Permit:  

Location/ Sketch Plan with detailed information about business

Responsibility of the client

Photocopy of Certificate of Occupancy with attached copy of Certificate of Final Electrical Inspection

Responsibility of the client

Renewal of Business License/ Mayor’s Permit:

Photocopy of Certificate of Occupancy/Certificate of Annual Inspection

Responsibility of the client

Certification duly signed and sealed of a license Professional (Architect, CE, PEE, PME, RMP, SE)

Responsibility of the client

Certificate of Final Electrical Inspection, if any

 To be secure from BFP Mun. Fire Marshall by the client

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present the required supporting documents for initial verification.

Verifies and reviews supporting documents.

After verification of all necessary plans/ documents and clearances, you will be advised of the schedule date of inspection

None

10 minutes

Engineering Staff at front desk

2.Be available at site with the inspection team during conduct of the inspection.

Conducts inspection, evaluation and assessment of fees

None

2.5 hours

Engineer II

City Engineer

3.Inquire about the results one day after the inspection.

  1. if there are no deficiencies, proceed to Step 6.
  2. if there are deficiencies you will be instructed to make the necessary corrections

Informs the client whether the documents and requirements are complete and in order and whether plans and documents require correction/s.

None

15 minutes

Engineering Staff

4.After complying with the corrections, inform the City Engineer’s Office and inquire schedule of re-inspection

Schedules re-inspection

None

10 minutes

Engineering Staff

5.Be available at site with the inspection team during conduct of the re-inspection.

Conducts re-inspection

None

1 hour

Engineering Staff

Engineer II

City Engineer

6.Secure an order of payment from the City Engineer’s Office

Issues an order of payment

Advises the client to return one working day after payment of fees to claim the Certificate of Annual Inspection and Cert of Electrical Inspection

None

10 minutes

Engineering Staff

7.Present an order of payment, pay the required fees and secure an official receipt to the City Treasurer’s Office

Receives payment and issues official receipt.

Provide OBO of photocopy of OR

None

10 minutes

Treasurer’s Revenue Collection Clerk

8.Secure approved Certificate of Annual Inspection and Certificate of Electrical Inspection.

Releases approved Certificate of Annual Inspection and Certificate of Electrical Inspection

None

5 minutes

Engineering Staff