OFFICE OF THE SECRETARY TO THE SANGGUNIANG PANLUNGSOD

EXTERNAL SERVICE

1.Issuance of New & Renewal of Tricycle Franchise

Tricycle Franchise is an authority granted by the Sangguniang Panlungsod to tricycle owners who operate motorized tricycle-for-hire within a route designated in the franchise and containing the provisions and conditions of the granted authority (Sec. 1 of Ordinance No. 08-191, as amended).

All owners of tricycles-for-hire or those who intend to operate tricycles-for-hire are required to secure a franchise prior to commencement of operation.

Office or Division:

Secretary to the Sangguniang Panlungsod Office

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Owners/operators/Drivers of tricycle-for-hire

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Driver’s License (Original or 1 Photocopy for verification)

Certificate of Registration/Official Receipt (Original or 1 Photocopy for verification)

Cedula (Original or 1 Photocopy for verification)

Office of the City Treasurer, window 2 or 3

Clean windshield (for inspection)

Garbage Receptacle (for inspection)

Functioning horn that does not emit exceptionally loud or startling sound (for inspection)

Two (2) signal lights, front and back, for turning right or left or for emergency purposes (for inspection)

Tail Lights (for inspection)

License plate light (for inspection)

Chain guard (for inspection)

White headlights (for inspection)

Light installed inside the sidecar (for inspection)

Silencer (for inspection)

Body number (placed prominently to be identifiable from a distance) (for inspection)

Fully operating mufflers (for inspection)

Roadworthiness of the tricycle unit (for inspection)

Color Code (Body color) (for inspection)

TODA Certification  (Original copy for verification)

TODA President

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present documentary requirements

1.Evaluate the documentary requirements

10 Minutes

SSBO Staff

SSB Office

2.Physical inspection of the tricycle-for-hire

2.Inspection of the tricycle unit

10 Minutes

SSBO Staff

SSB Office

3.Presentation of “checklist for tricycle franchise” duly filled-up and signed at the City Treasurer’s Office (MTO)

3.Evaluate the documents

None

MTO Staff – Window 4

City Treasurer’s Office

4.Issuance of Application Form

None

MTO Staff – Window 4

City Treasurer’s Office

5.Presentation of the sworn application for franchise at the Office of the Mayor for signature

None

Mayor’s Staff

Mayor’s Office

6.Submit duly filled-up Special Authority (Franchise) to the SB (thru the SSBO) for signature

6.Accept the duly filled-up Special Authority (Franchise)

None

1 Minute

SSBO Staff

SSB Office

7.Present duly signed application form at the MTO for the issuance of Special Authority (Franchise) Form

MTO Staff – Window 4

City Treasurer’s

8.Payment of fees at the MTO

Annual Franchising Fee – Php 100.00

Filing Fee – Php 25.00

Fare Adjustment Fee for Fare Increase – Php 25.00

Filing Fee for Amendment of MTOP – Php 25.00

For renewal of expired franchise – penalty of Php 80.00

MTO Staff – Window 4

City Treasurer’s

TOTAL:

21 Minutes

2.Issuance of Certified Copy/ies of Records of Public Character in Custody

Furnish, upon request of any interested party, certified copy of records of public character in his custody, upon payment to the treasurer of such fees as may be prescribed by ordinance.

Office or Division:

Secretary to the Sangguniang Panlungsod Office

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

General Public

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Request letter addressed to the Honorable City Vice-Mayor

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1. Present the letter request

1.Receive request

None

2 Minutes

SSBO Staff

SSB Office

2. Present the letter request to the Honorable Vice-Mayor

2.Approve request

None

2 Minutes

Vice-Mayor

Vice-Mayor’s Office

3. Issue Order of Payment

3.Issue Order of Payment

None

2 Minutes

SSBO Staff

SSB Office

4. Payment of necessary fees at the City Treasury

Php 40.00 per page of certified copy of document requested

5 Minutes

MTO Staff – Window 4

City Treasurer’s Office

5. Reproduction and Certification

5.Reproduce and certify

None

5 Minutes

SSBO Staff

SSB Office

6. Issue certified copy/ies to the requesting party

6.Record in a logbook for the purpose the released documents

None

2 Minutes

SSBO Staff

SSB Office

TOTAL:

18 Minutes

3.Cancellation of Tricycle Franchise

Tricycle-for-hire, bearing yellow plate, which is to be operated in another City, is required to have its franchise cancelled (by the City of origin) prior to the issuance a new franchise by the City to where it will be relocated or transferred.

Office or Division:

Secretary to the Sangguniang Panlungsod Office

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Tricycle Owners/Operators

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Tricycle Franchise (1 Photocopy)

Certificate of Registration/Official Receipt (1 Photocopy)

Deed of Sale (if necessary) (1 Photocopy)

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1. Present the requirements

1.Receive and evaluate the requirements

None

2 Minutes

SSBO Staff

SSB Office

2. Payment of necessary fees at the City Treasury

Php 40.00

2 Minutes

MTO Staff – Window 4

City Treasurer’s Office

3. Issue Order of Payment

3.Issue Order of Payment

None

2 Minutes

SSBO Staff

SSB Office

4. Presentation of the Official Receipt from the City Treasury

4.Accept and print the Certification of Cancellation

None

2 Minutes

SSBO Staff

SSB Office

5. Signing of the Cancellation

5.Sign Cancellation of Franchise

None

5 Minutes

SB Secretary

SSB Office

6. Issue signed document

6.Record in a logbook for the purpose the released documents

None

2 Minutes

SSBO Staff

SSB Office

TOTAL:

15 Minutes

4.Issuance of Tricycle Temporary Permit

Tricycle Temporary Permit is a permit granted by the Sangguniang Panlungsod to tricycle owners who operate motorized tricycle-for-hire within a route designated in the franchise and containing the provisions and conditions of the grant authority (Sec. 1 of Ordinance No. 08-191).

All owners of tricycles-for-hire or those who intend to operate tricycles-for-hire are required to secure a permit prior to commencement of operation.

Office or Division:

Secretary to the Sangguniang Panlungsod Office

Classification:

Simple

Type of Transaction:

G2C

Who may avail:

Owners/operators/Drivers of tricycle-for-hire

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

Driver’s License (1 Photocopy)

Certificate of Registration/Official Receipt (1 Photocopy)

Tricycle Franchise (1 Photocopy)

Office of the City Treasurer, window 4

Cedula (1 Photocopy)

Office of the City Treasurer, window 2 or 3

Clean windshield (for inspection)

Garbage Receptacle (for inspection)

Functioning horn that does not emit exceptionally loud or startling sound (for inspection)

Two (2) signal lights, front and back, for turning right or lfet or for emergency purposes (for inspection)

Tail Lights (for inspection)

License plate light (for inspection)

Chain guard (for inspection)

 White headlights (for inspection)

Light installed inside the sidecar (for inspection)

Silencer (for inspection)

Flat Bar for Body number casing (for inspection)

Fully operating mufflers (for inspection)

Roadworthiness of the tricycle unit (for inspection)

Color Code (for inspection)

TODA Certification  (Original copy for verification and 1 Photocopy)

TODA President

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

1.Present documentary requirements

1.Evaluate the documentary requirements

None

10 Minutes

SSBO Staff

SSB Office

2. Physical inspection of the tricycle-for-hire

2.Inspection of the tricycle unit

None

10 Minutes

SSBO Staff

SSB Office

3. Issuance and filling up of Application Form for Temporary Permit

3.Issue the Application form for Temporary Permit

None

5 Minutes

SSBO Staff

SSB Office

4. Payment of fees at the MTO

4.Issue an Official Receipt

Business Tax – Php 110.00

Registration Fee – Php 80.00

Sticker – Php 35.00

For renewal of temporary permit – penalty of Php 56.25

MTO Staff – Window 4

City Treasurer’s

5. Presentation of the “Official Receipt” and the duly filled-up and signed Application Form for Temporary Permit

5.Assign Control Number and sticker

None

3 Minutes

SSBO Staff

SSB Office

6. Issue Temporary Permit

6.Record in a logbook for the purpose the released documents

None

2 Minutes

SSBO Staff

SSB Office

TOTAL:

30 Minutes